Preloader Image

Kornis Jazan project

About project

The Municipality of Experts is currently implementing integrated programs for asphalt, sidewalks and lighting works through a package of asphalt projects under implementation. These projects include a project to open structural roads with a value of 2,639,440 riyals and is implemented within 540 days from the date of handing over the site to the contractor […]

  • Project Title Kornis Jazan project
  • Client TThemeForest Envato
  • Category Construction
  • Location Bulls Stadium, Califorina

Project Details

The Municipality of Experts is currently implementing integrated programs for asphalt, sidewalks and lighting works through a package of asphalt projects under implementation. These projects include a project to open structural roads with a value of 2,639,440 riyals and is implemented within 540 days from the date of handing over the site to the contractor on 10/8/1434 AH and includes This project is the completion of the opening and asphalting of the first stage of structural roads in the northern direction of both King Khalid Road and the perpendicular road that is scheduled to link King Abdulaziz Road with the service road of the expressway (Qassim – Medina). These projects also included a road expansion project King Abdullah after the exit with a value of 2.422.140 riyals and it will be implemented within 540 days from the date of handing over the site to the contractor on 10/8/1434 AH This project includes expansion works for King Abdullah Road after the exit from both sides until the end of the services of the municipality of experts, followed by the laying of a full surface pavement layer The road surface, and then after that, planning the entire site, placing the indicative panels, and completing the work on this important site completely. This project also includes the complete rehabilitation and maintenance of the Dallah Square. Asphalt surfaces in some sites from King Abdullah Road, which were included in the study of the project. These projects also included a project of asphalt, sidewalks and lighting worth 4,699,903 riyals and will be implemented within 720 days from the date the contractor received the implementation sites on 20/1/1434 AH and this project included Asphalting and lighting works for many roads in the industrial neighborhoods and the northern clouds, as well as rehabilitation work for a section of King Faisal Road with a length of 1.6 km with the implementation of a roundabout at the intersection of the Experts – Al Badai’a Road with the old Experts Road, as well as lighting the road separating the services of experts and veterans with a length of 2.5 km and completing the lighting Al-Rayyan neighborhood and pavement works in Al-Rabwah neighborhood etc. from the targeted works in this project, this has been the municipality has benefited from the work of the savings of previous projects where these projects were launched under the name of asphalt project and sidewalks and lighting with a value of 1.394.010 riyals and is implemented within 360 days from the date of delivery of the work sites For the contractor on 20/9/1434 AH, the works of the Wafer Project included placing a shallow pavement layer in one direction from King Abdullah Road in the distance from Dallah Square to the beginning of the motorway exit, and also included works for To provide complete lighting for the road separating the services of experts and veterans with a length of 2.5 km and lighting the thirtieth road that connects the clouds to the highway in the distance from King Abdulaziz Road to King Fahd Road with a length of 1.7 this and the municipality is keen to provide the best possible service to the citizens of the sons of experts and cities and neighboring villages and that In light of the wise guidance and generous support of our rational government led by the Custodian of the Two Holy Mosques – may God protect him-. The municipality recently inaugurated the first stage of the project to establish wild parks with experts and protect them, after awarding the works of the first stage through a public competition for a national institution. The value of the project contract amounted to 2.458.825 riyals and a duration of 540 days, and the site was delivered on 07/02/1435 Indeed, all the preparatory procedures for the project work have been completed by approving the executive plans for the project work by this municipality. We point out that the site of the first stage of the project north of the Experts Highway Road is about 2 km from the power station and the area of ​​the first stage is about 1,500,000 m 2 One million and five hundred thousand square meters and the project’s works include the construction of a barbed-wire fence protection on the external borders of the site of the first stage of the wild park, as well as the implementation of an irrigation network to irrigate the wild trees included in the project, as well as green spaces in the project in addition to the implementation of some of this service facilities and the municipality is keen to be careful. To provide the best possible service to citizens of the sons of experts, cities and neighboring villages, in light of the wise guidance and generous support of our rational government led by Kha Blood of the Two Holy Mosques – may God protect him – .. The Municipality of Experts recently launched its official account on the social networking site “Twitter”, where the mayor of Experts noted the importance of this step in highlighting the unlimited support from the government of the Custodian of the Two Holy Mosques through the publication of the municipality’s work and activities Effective and networking